Smart Molding International 2-2022
7 newsfeed www.smart-molding.com 2021 – a record year for the WITTMANN Group In the fiscal year 2021, the WITTMANN Group realized € 376 mil- lion in sales, the third highest figure in its corporate history. The order intake figure even reached an all-time high. In spite of the supply chain problems preventing an even higher sales figure, theWITTMANN Group is looking ahead with optimism. This optimism is also reflected in the Group’s continuing investment activi- ties. At WITTMANN BATTENFELD in Kot- tingbrunn, the construction of a new hall with more than 3,000 m² floor space was started in 2021, to house a fully automatic pallet shelf warehouse with 1,700 storage locations, an assem- bly area for large and vertical machines, as well as a new electrical workshop. Most of the construction work has now been completed. The assembly hall will go into operation at the end of July, the pallet shelf warehouse and the electri- cal workshop will be operating at full capacity by September. On the roof of the new hall, a solar power system is being installed, consisting of 1,604 pan- els with a total capacity of 651.8 MWh per annum. Moreover, the extension of the R&D facility of WITTMANN Technology GmbH, located at Percostrasse in Vi- enna, was completed this April. Most of the new offices for 40 software and hardware developers are already oc- cupied. WITTMANNBATTENFELDDeutschland GmbH is investing in both of its techni- cal labs located at Meinerzhagen and Nuremberg. In Meinerzhagen, the existing technical lab is being remod- eled and extended, to offer customers sufficient space for factory acceptance tests from autumn this year. The tech- nical lab located in Nuremberg is being completely modernized. Another major investment project is under way in the USA. In May 2022, the last extension stage for Plant 1 of WITTMANN USA Inc. in Torrington, CT has been commissioned. This will be an extension by 1,000 m² of the area for automation systems and complete injection molding cells, combined with further structural al- terations, such as a solar power sys- tem consisting of 539 panels with a total annual capacity of 322.9 MWh. Further extensions are also planned for the neighboring Plant 2. The Polish WITTMANN subsidiary, WITTMANN BATTENFELD Polska Sp. z o.o., has purchased a 16,400 square meter piece of land in Krze Duże, close to its current location. Planning for the construction of a new building for sales, service and training facilities is in full swing. The start of construction is scheduled for the end of the first quar- ter of 2023. Completion is expected be- fore the end of 2023. For Michael Wittmann, CEO of the WITTMANN Group, the ongoing invest- ments are an important step to secure continuing corporate success for the years to come. WITTMANN BATTENFELD www.wittmann-group.com/en_us WITTMANN Technology GmbH, Vienna (all pictures: WITTMANN Group) Future sales and service building of WITTMANN BATTENFELD Polska Sp. z o. o.
RkJQdWJsaXNoZXIy ODIwMTI=